本システムでは、JavaScriptを利用しています。JavaScriptを有効に設定してからご利用ください。
本文へスキップします。
本文へ
【全・英】logo
About Us
Company Profile
Action Policies of PADECO
General Background
Organization
Office Locations
PADECO’s Contribution to SDGs
Vision
Our Works
Project List
Services
Initiatives
Careers
Life at PADECO
Apply
Associate CV Registration
Open Positions
Contact Us
News
Terms of use
Sitemap
【全・英】言語ボタン
JP
EN
JAPANESE
【全】メガメニュー
ホーム
会社情報
コーポレートメッセージ
会社概要・沿革
組織図・役員
事業所一覧
パデコのSDGsへの貢献
ビジョン
事業概要
事業セクター
サービス
イニシアティブ
PADECO Academy
採用情報
パデコの仕事(会社、仕事を知る)
中途採用
中途採用応募フォーム
アソシエート登録
お問い合わせ
お知らせ
使用条件
サイトマップ
お取引先様へ
HOME
About Us
Company Profile
General Background
Organization
Office Locations
PADECO’s Contribution to SDGs
Vision
Our Works
Project List
Services
Initiatives
Careers
Life at PADECO
Apply
Associate CV Registration
Open Positions
Contact Us
News
Terms of use
Sitemap
PADECO Education
H1
Search Detail
汎用DB:詳細
PREPARATION OF THE FEASIBILITY STUDY FOR THE KHULNA WATER SUPPLY PROJECT (PHASE-2)
Water and Sanitation
Southeast and South Asia
Client
ADB
Country・Area
Bangladesh
To address the challenges faced by Khulna city in its water supply capacity due to increasing salinity and population growth, the project prepared a comprehensive water supply investment program, capacity building within Khulna Water Supply and Sewerage Authority (KWASA), and a thorough evaluation of the city's institutional, financial, and governance aspects to ensure the water supply system's sustainable operation. Three possible options of alternative water supply system were studied to ensure the required quantity and quality of drinking water during the dry season when salinity is high at the Mollahat intake. The study included details of planning, engineering design plans, required land acquisition for each option and the best option was recommended by the consulting team.
PADECO was responsible for (1) Climate change aspects including climate vulnerability and risk assessment and incorporating the findings into the design report; (2) Urban resilience / climate change adaptation workshop and study on nature base solutions such as rainwater harvesting and aquifer recharge; (3) Water supply including assessing the level and quality of the existing services and preparing preliminary engineering designs for the distribution networks; (4) Social, poverty and gender analysis including preparation of social safeguards assessment and due diligence; (5) Environmental baseline assessment and the environmental impact analysis.
To Search List
ホーム
>
HOME
>
Our Works
>
Project List
>
PREPARATION OF THE FEASIBILITY STUDY FOR THE KHULNA WATER SUPPLY PROJECT (PHASE-2)