The objective of this project is to implement procurement, construction, testing, and commissioning of Mumbai Metro Line 3 corridor (MML3) which includes all civil engineering structures, tracks, signals, telecom facilities, traction arrangements, air conditioning & ventilation, rolling stock, car depots, stations, operation control center, offices, station integration areas, and underground sections over the project route, integration with other modes of transport, etc.
PADECO’s scope of work is related to supervision of construction and operational design of Mumbai Metro Line 3, specifically:
i)
Preparation of PQ/Tender documents for system packages,
ii)
Assistance in procurement for all contract packages including civil works,
iii)
Establishing and maintaining of strategy for contract administration, safety, quality control assurance,
iv)
Design of multi-modal transport system,
v)
Design and inspection of rolling stock and rail communication system to ensure efficient and reliable operations, and
vi)
Overall site supervision for station/tunnel works, depot works and system works.