本システムでは、JavaScriptを利用しています。JavaScriptを有効に設定してからご利用ください。
本文へスキップします。
本文へ
【全・英】logo
About Us
Company Profile
Action Policies of PADECO
General Background
Organization
Office Locations
PADECO’s Contribution to SDGs
Vision
Our Works
Project List
Services
Initiatives
Careers
Life at PADECO
Apply
Associate CV Registration
Open Positions
Contact Us
News
Terms of use
Sitemap
【全・英】言語ボタン
JP
EN
JAPANESE
【全】メガメニュー
ホーム
会社情報
コーポレートメッセージ
会社概要・沿革
組織図・役員
事業所一覧
パデコのSDGsへの貢献
ビジョン
事業概要
事業セクター
サービス
イニシアティブ
PADECO Academy
採用情報
パデコの仕事(会社、仕事を知る)
中途採用
中途採用応募フォーム
アソシエート登録
お問い合わせ
お知らせ
使用条件
サイトマップ
お取引先様へ
HOME
About Us
Company Profile
General Background
Organization
Office Locations
PADECO’s Contribution to SDGs
Vision
Our Works
Project List
Services
Initiatives
Careers
Life at PADECO
Apply
Associate CV Registration
Open Positions
Contact Us
News
Terms of use
Sitemap
PADECO Education
H1
Search Detail
汎用DB:詳細
Preparatory Survey for Port of Bujumbura Port Expansion Project
Ports and Maritime Transport
Africa
Client
Japan International Cooperation Agency
Country・Area
Burundi
Bujumbura Port is the largest port on Lake Tanganyika, but it cannot provide appropriate transport services because of a lack of cargo handling equipment and the limited depth of the port basin due to siltation and sedimentation. In the Master Planning Study for Port Sector in the Republic of Burundi, conducted by PADECO in 2011-2012, PADECO undertook consulting services for the expansion of Bujumbura Port, and prepared a preliminary design and cost estimate for these facilities, for which grant aid from the Government of Japan would be provided. As the trade base and development node in this landlocked East African country, Bujumbura Port strategically dominates the country’s transport network. PADECO implemented the project to clarify the necessity and adequacy of the Government of Burundi’s assistance request and to prepare an outline design considering the proposed port development as a grant aid project to stimulate economic development in Burundi. The major services PADECO provided were as follows: ・Planning for the expansion of Bujumbura Port; ・Preliminary design of the container terminal and ship repairing facilities; ・Cost estimation; ・Planning for project implementation; and ・Environmental survey on surface-soil and lakebed sediment.
To Search List
ホーム
>
HOME
>
Our Works
>
Project List
>
Preparatory Survey for Port of Bujumbura Port Expansion Project