本文へスキップします。

H1

Search Detail

H1

汎用DB:詳細

India Preparatory Survey for Construction of Dedicated Freight Corridor (Phase2)

Traffic and Transport PlanningMass Transit and Rail
Southeast and South Asia
India Preparatory Survey for Construction of Dedicated Freight Corridor (Phase2)
Client Japan International Cooperation Agency
Country・Area India
The objective of this survey is to verify the readiness for project implementation by checking the progress and accuracy of the preparation work prepared as Final Location Survey (FLS) and to consolidate specific preparatory work that will be necessary when the Japanese ODA loans are offered in the future. The target section for the preparatory survey is the Western Corridor, except for those conducted in the Phase 1 (Rewari-Vadodra) Study. The plans/documents prepared as a result of FLS have been reviewed and designated engineers have been interviewed by the study team. Furthermore, the study team has conducted a site visit for the assessment of environmental conditions and progress of the FLS.