本システムでは、JavaScriptを利用しています。JavaScriptを有効に設定してからご利用ください。
本文へスキップします。
本文へ
【全・英】logo
About Us
Company Profile
Action Policies of PADECO
General Background
Organization
Office Locations
PADECO’s Contribution to SDGs
Vision
Our Works
Project List
Services
Initiatives
Careers
Life at PADECO
Apply
Associate CV Registration
Open Positions
Contact Us
News
Terms of use
Sitemap
【全・英】言語ボタン
JP
EN
JAPANESE
【全】メガメニュー
ホーム
会社情報
コーポレートメッセージ
会社概要・沿革
組織図・役員
事業所一覧
パデコのSDGsへの貢献
ビジョン
事業概要
事業セクター
サービス
イニシアティブ
PADECO Academy
採用情報
パデコの仕事(会社、仕事を知る)
中途採用
中途採用応募フォーム
アソシエート登録
お問い合わせ
お知らせ
使用条件
サイトマップ
お取引先様へ
HOME
About Us
Company Profile
General Background
Organization
Office Locations
PADECO’s Contribution to SDGs
Vision
Our Works
Project List
Services
Initiatives
Careers
Life at PADECO
Apply
Associate CV Registration
Open Positions
Contact Us
News
Terms of use
Sitemap
PADECO Education
H1
Search Detail
汎用DB:詳細
Preparation of detail design and construction supervision of Zestafoni-Kutaisi-Samtredia road section of the E-60 Highway
Traffic and Transport Planning
Roads and Highways
Eastern Europe and Central Asia
Client
Roads Department of the Ministry of Regional Development and Infrastructure of Georgia
Country・Area
Georgia
The project consists of the Detail Design (DD) and Construction Supervision (CS) of 59 km of the East-West highway (E-60). E-60 runs from Azerbaijan to the Black Sea through Tbilisi, the capital city of Georgia, and its development is one of the highest priorities for the country's economic development. The Governments of Japan and Georgia agreed to use a Japanese official development assistance (ODA) loan for the construction of this section based on the results of studies carried out by PADECO for the Japan Bank for International Cooperation and the Japan International Cooperation Agency. The scope of the DD includes the preparation of highway alignment and detailed engineering designs of highway sections, bridges, interchanges, culverts, and river revetments. In addition, the consultants updated the Environmental Impact Assessment and prepared a Resettlement Action Plan and Environmental Management Plan. Since the construction work was divided into three sections, tender documents were prepared for each section. Following the DD, the CS services are currently being carried out with completion expected within the total construction period of 30 months.
To Search List
ホーム
>
HOME
>
Our Works
>
Project List
>
Preparation of detail design and construction supervision of Zestafoni-Kutaisi-Samtredia road section of the E-60 Highway