本文へスキップします。

H1

News

H1

お知らせ:カテゴリメニュー
お知らせ:表示

Mr. Y. Motomura, President and CEO of PADECO Co., Ltd. visited the construction sites of Mumbai Metro Line 3 and Mumbai Trans-Harbor Link on 26 April 2019.

2019/05/10Information

Mr. Y. Motomura, President and CEO of PADECO Co., Ltd. visited the construction sites of Mumbai Metro Line 3 and Mumbai Trans-Harbor Link, for both of which PADECO has been serving as the general consultant. The former is a 33 km long fully underground subway with the total project cost of USD 3.1 billion and the latter is a 23 km long bridge above the Mumbai bay with the total project cost of USD 2.2.billion. Both projects are among the largest in the world.